We break out the installation process over four easy steps. Click on one of the phase links below to see more information on each process.
The first phase consists of installing the iTracker in the manhole.
The second phase consists of setting up the Eastech Cloud for your organization.
The third phase consists of uploading the data to the Eastech Cloud.
The final phase consists of reviewing the results of the I&I Study.
Below are documents related to the iTracking system.
The complete guide to the iTracker.
The Equipment Checklist for installations.
The iTracker installation in 4 easy phases.
The IOM for the Eastech Connect App.